Processing math: 100%
Cost Per Yard Calculator
Definitions
- Cost Per Yard (CPY): The cost of one yard of material or the cost per yard to build something.
- Total Cost (TC): The overall cost of the material or project.
- Length (L): The total length in feet.
Example
Let's say the total cost (TC) is $300 and the length (L) is 90 feet. Using the formula:
CPY=30090/3
We get:
CPY = \frac{300}{30} = 10 \text{ $/yard}
So, the cost per yard is $10 per yard.
Extended information about "Cost-Per-Yard-Calculator"
Price per Square Yard Calculator
Formula: Price per Square Yard = Total CostTotal Square Yards
- Total Cost: The total cost of the material or service
- Total Square Yards: The total area in square yards
Example: Price per Square Yard = 50025
Cost per Cubic Yard
Formula: Cost per Cubic Yard = Total CostTotal Cubic Yards
- Total Cost: The total cost of the material or service
- Total Cubic Yards: The total volume in cubic yards
Example: Cost per Cubic Yard = 100050
Feet per Yard Calculator
Formula: Feet per Yard = Yards×3
- Yards: The length in yards
Example: Feet per Yard = 10×3
Cost Calculator for Concrete Yards
Formula: Concrete Cost = Volume in Cubic Yards×Cost per Cubic Yard
- Volume in Cubic Yards: The total volume of concrete needed
- Cost per Cubic Yard: The cost per cubic yard of concrete
Example: Concrete Cost = 20×75
Price per Cubic Yard
Formula: Price per Cubic Yard = Total CostTotal Cubic Yards
- Total Cost: The total cost of the material or service
- Total Cubic Yards: The total volume in cubic yards
Example: Price per Cubic Yard = 150030
Cubic Yards Price Calculator
Formula: Cubic Yards Price = Volume in Cubic Yards×Price per Cubic Yard
- Volume in Cubic Yards: The total volume of material needed
- Price per Cubic Yard: The price per cubic yard of material
Example: Cubic Yards Price = 25×60
7Search Calculator© - All Rights Reserved 2025